Times are displayed in (UTC-05:00) Eastern Time (US & Canada)Change
The Caster for Green Steel
The necessary transition to green steel involves replacing traditional BOF production with electric steelmaking. Raw materials will also change, affecting the composition of the liquid steel. Continuous slab production has to cope with these significant changes. However, the main concern for steelmakers is to maintain the same high level of quality in the final product. Precise treatment of the hot strand is therefore required to achieve crack-free surface and homogenized internal quality at high productivity. This requires advanced gap and geometry design, sophisticated secondary cooling methods and the use of the latest generation of electromagnetic actuators for flow control.
Michael Riedler | Primetals Technologies Austria GmbH
Mr. Alija Vila | Primetals Technologies Austria GmbH
Mr. Denijel Burzic | Primetals Technologies Austria GmbH
Mr. Thomas Lengauer | Primetals Technologies Austria GmbH
Mr. Gerald Hrazdera | Primetals Technologies Austria GmbH
Mr. Andreas Jungbauer | Primetals Technologies Austria GmbH
The Caster for Green Steel
Category
Paper and Presentation
Description
Custom CSS
double-click to edit, do not edit in source
Session: Continuous Casting: New Caster Developments Track: Continuous Casting Date: 5/8/2024 Room: A213/214 Presentation Time: 08:30 AM to 09:00 AM