Optimization of Steel Plate Storage Yard Crane Scheduling
This paper addresses the steel plate storage yard crane scheduling problem, focusing on minimizing both the number of crane movements and the loading time in a large steel shipyard. The proposed generates a cost-efficient schedule that adheres to operational constraints while optimizing crane efficiency. By reducing unnecessary movements and streamlining loading processes, the approach enhances both short-term and mid-term operational performance. Utilizing optimization algorithms for rapid decision-making, this solution is tailored to real-world applications, ensuring practical improvements in crane operations, loading time and overall yard management efficiency.
Authors:
Paulo Sérvulo Leoncio dos Santos | ENACOM
Adriano Chaves Lisboa | ENACOM
Miguel Marques Ferreira | ENACOM
Mr. Matheus de Oliveira Mendonça | ENACOM
Igor Mateus Ribeiro Caetano | ENACOM
Gustavo Rodrigues Lacerda Silva | ENACOM
Mr. Douglas Alexandre Gomes Vieira | ENACOM
Luiz Paulo Horta Torres | Gerdau
Ricardo Lopes Tinoco | Gerdau
Bruno Alvares | Gerdau
Bruno da Silva Breder | Gerdau
Session Chairs:
Rich Warriner | SpanGuard Corporation
Bradley Neese | AM/NS Calvert LLC
Optimization of Steel Plate Storage Yard Crane Scheduling
Category
Paper and Presentation
Description
Session: Cranes: Automation
Track: Cranes
Date: 5/5/2025
Session Time: 2:00 PM to 5:00 PM
Presentation Time: 04:00 PM to 04:30 PM
Track: Cranes
Date: 5/5/2025
Session Time: 2:00 PM to 5:00 PM
Presentation Time: 04:00 PM to 04:30 PM